What the live track diagram shows - occupancy, signals, trains, delays, level crossings, kilometre stones and signal telephones - and what a click on it does.

The Map tab shows the rail network of the dimension you are in, from above. The same picture appears on the track map displays, desks and consoles.

Scroll to zoom, drag with the right mouse button to move. Hover over a signal or a train to see what a click would do.

What you see

On the mapMeaning
Black track linesThe track network
Track section in redOccupied: a train stands or runs in it
Track section in yellowReserved for a train
Signal green / yellow / redThe aspect of the Create signal
StationIn the colours of the lines that stop there
Station framed in red, crossed out, red nameThe station is closed
TrainIn the colour of its line, labelled with line and destination
Train with a red borderDelayed; the delay stands next to its name
Crossbuck, narrowLevel crossing open
Crossbuck red in a red frameLevel crossing secured
Grey dot with a numberLettered kilometre stone
Small white box with a receiverSignal telephone; flashes yellow and shows its name while it rings or a call runs
Yellow rectangleA control area (only on an admin desk)

A legend of the lines sits at the side.

Delays

A train counts as delayed from 30 seconds, as CRN reports it. On the map it gets a red border and its delay next to its name; in the Lines tab the delay stands behind the train.

Level crossings

Level crossings appear as a crossbuck. Only crossings whose control box is loaded are shown. An on-call crossing that is waiting for release can be released by a click on the map, see Level crossings.

Kilometre stones

A Kilometre Stone lettered with Create's wrench (for example 12,4: 12 on top, 4 below) appears on the map with its value, also where the area is not loaded. Station, crossing and train labels go first where space is tight.

Signal telephones

Each Signal Telephone shows as a small white box. While it rings or a call is running, it flashes yellow and carries its name, for example "F P7". The telephone itself belongs to the train radio, see Train radio.

What a click does

Click onEffect
A signalLocks it at stop, or releases a locked signal, see Signal locks.
A trainHolds it at its next stop, or releases it.
A shunting signal (Sh)Cycles it: Sh 1 (proceed), Sh 0 (stop), back to automatic.
A calling on-call crossingReleases the barrier.

The Map tab also has the buttons Entry-exit (see Routes) and Substitute signal (see Signal locks).